GNSS Construction Surveying for Mountain Villa
We provided full setting-out and earthwork verification surveying for a new private villa in the Chouf district. Using a SOUTH GNSS rover with cm-level RTK accuracy, we staked the building footprint, verified retaining-wall geometry, and produced as-built quantities for the contractor's monthly billing.

التحدي
The site combined steep terrain with multi-level retaining walls and required tight coordination with both the excavator crew and the structural engineer. Any setting-out error early in the build would propagate through every level above it, so the survey had to be defensible against the design drawings and the OEA-approved permit set.
النتيجة
The villa shell was set out and verified to within design tolerance on every level. The contractor used our as-built quantities directly for billing, and the client received a complete control record they can hand to any future engineer working on the site.
حلّنا
RTK GNSS Reference Network
We established a local RTK base station tied to a known control point so the rover could deliver centimeter accuracy across the full site, even on the lower terraces where line-of-sight was limited.
Building Footprint & Retaining-Wall Setting-Out
Building corners, retaining-wall alignments, and rebar-cage centerlines were staked and double-checked against the architect's plan. Each stake was tagged with elevation so the formwork team could pour to design level without re-measurement.
Earthwork Quantity Verification
Pre- and post-excavation surveys produced cut-and-fill volumes for the contractor. The same dataset fed an as-built record for the client and supported monthly progress invoicing without disputes.
المواد والتقنيات
كيف حللنا المشكلة



لماذا وايت لاين
أربعة التزامات غير قابلة للتفاوض تميزنا عن كل شركة أخرى في لبنان.
وعد "الخط المستقيم"
شفافية كاملة من اليوم الأول. لا تكاليف مخفية، لا مفاجآت. ما نعرضه هو ما تدفعه — نضعه كتابةً.
الدقة التقنية
مواد سيكا وماباي وBASF الممتازة. أجهزة مساحة Leica وDJI. تصاميم متوافقة مع LIBNOR. دقة دون السنتيمتر في كل تسليم.
ضمان سنة كاملة
ضمان مكتوب لمدة ١٢ شهراً على جميع أعمال الهندسة والعزل المائي. نقف خلف كل مشروع طويلاً بعد التسليم.
ثقافة السلامة أولاً
سجل ٤ سنوات بلا حوادث. نتبع كل بروتوكول سلامة دولي — لأن فريقنا يعود إلى عائلاته كل ليلة.